Warehouses

Smart logistics build-outs — WMS-integrated robotics, conveyor controls, AI surveillance and yard management.

Capabilities

  • AS/RS & AMRs
  • Conveyor & sorter controls
  • Yard management (ANPR)
  • Cold-chain monitoring
  • Pick-to-light / voice
  • Vision-based parcel dimensioning
  • WMS & TMS integration

Typical use cases

  • E-commerce fulfilment
  • 3PL hubs
  • Cold storage
  • Cross-dock
  • Returns processing

Measured outcomes

  • Higher pick rates
  • Lower shrink & damage
  • Lower energy / sqft

Standards & compliance

GDP for cold chainLocal HSE codes
Implementation timeline

Predictable delivery, phase by phase

Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.

  1. 1

    Phase 1 — Throughput Modelling

    3–4 weeks

    Order-profile, slotting and robotics-vs-manual modelling.

  2. 2

    Phase 2 — MHE & WMS Design

    6–10 weeks

    Conveyor, AS/RS, AMR and WMS/TMS integration design.

  3. 3

    Phase 3 — Build & Commissioning

    16–24 weeks

    MHE install, controls integration and ramp-up testing.

  4. 4

    Phase 4 — Go-live with Twin Running

    4–6 weeks

    Twin-running with manual fallback and KPI validation.

  5. 5

    Phase 5 — Continuous Throughput

    Ongoing

    MHE preventive maintenance, slotting optimisation and peak-season readiness.