End-to-end airside, terminal and landside integration — from runway lighting and ATC interfaces to biometric e-gates and AOCC command rooms.

Capabilities

  • Airfield ground lighting
  • A-CDM / AODB
  • Biometric e-passport gates
  • Apron & perimeter CCTV
  • BHS & stand allocation
  • Counter-UAS shield

Typical use cases

  • Passenger flow optimisation
  • Border control & immigration
  • Airside intrusion detection
  • Drone incursion response
  • Emergency operations

Measured outcomes

  • 60%+ shorter immigration queues
  • Zero successful drone incursions post-deployment
  • Sub-9s biometric passage

Standards & compliance

ICAO 9303IATA NEXTTTSA / local CAA
Implementation timeline

Predictable delivery, phase by phase

Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.

  1. 1

    Phase 1 — Airside / Landside Audit

    4–6 weeks

    AOCC workshops, regulator alignment (CAA/ICAO), passenger journey mapping and baseline ops metrics.

  2. 2

    Phase 2 — Systems Engineering

    8–12 weeks

    AGL, BHS, biometric, CCTV and C-UAS detailed design with safety case and CAT-III compliance.

  3. 3

    Phase 3 — Landside Build

    16–24 weeks

    Terminal ELV, e-gates, BHS controls, surveillance backbone — installed without disturbing live ops.

  4. 4

    Phase 4 — Airside Build & Cutover

    Night-window 8–12 weeks

    Runway lighting, navaids and apron systems commissioned in low-traffic windows with regulator witness tests.

  5. 5

    Phase 5 — AOCC Hyper-care & MRO

    Ongoing

    24/7 AOCC support, SLA-backed MRO, drone-incursion drills and seasonal optimisation.