ATC Infrastructure

Air traffic control build-outs spanning tower CWP, surveillance (radar/ADS-B/MLAT), nav aids and apron management systems.

Capabilities

  • ILS / DVOR / DME
  • Primary & secondary radar
  • ADS-B & MLAT
  • Tower & apron CWPs
  • Voice comms & recording
  • MET / AWOS integration
  • Electronic flight strips
  • Remote/digital tower

Typical use cases

  • New tower commissioning
  • Surveillance modernisation
  • Remote / digital towers
  • Apron management
  • Contingency tower deployments

Measured outcomes

  • Higher movement capacity
  • Reduced go-arounds
  • Single integrated controller picture
  • Sub-second track update rates

Standards & compliance

ICAO Annex 10EUROCAELocal ANSP standards
Implementation timeline

Predictable delivery, phase by phase

Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.

  1. 1

    Phase 1 — ANSP Engagement

    4–6 weeks

    ConOps workshops with ANSP, traffic forecast modelling and safety-case kickoff.

  2. 2

    Phase 2 — Surveillance & Navaid Design

    10–14 weeks

    Radar, ADS-B/MLAT, navaid siting, voice comms and CWP layout with redundancy plan.

  3. 3

    Phase 3 — Build & Integration

    20–30 weeks

    Antenna, shelter and CWP build with progressive integration to flight-data systems.

  4. 4

    Phase 4 — Operational Trials

    6–10 weeks

    Shadow-mode operations, controller training and regulator-witnessed safety case sign-off.

  5. 5

    Phase 5 — In-Service Support

    Ongoing

    24/7 support, calibration flights, software updates and capacity uplift studies.