ATC Infrastructure
Air traffic control build-outs spanning tower CWP, surveillance (radar/ADS-B/MLAT), nav aids and apron management systems.
Capabilities
- ILS / DVOR / DME
- Primary & secondary radar
- ADS-B & MLAT
- Tower & apron CWPs
- Voice comms & recording
- MET / AWOS integration
- Electronic flight strips
- Remote/digital tower
Typical use cases
- New tower commissioning
- Surveillance modernisation
- Remote / digital towers
- Apron management
- Contingency tower deployments
Measured outcomes
- Higher movement capacity
- Reduced go-arounds
- Single integrated controller picture
- Sub-second track update rates
Standards & compliance
Predictable delivery, phase by phase
Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.
- 1
Phase 1 — ANSP Engagement
4–6 weeksConOps workshops with ANSP, traffic forecast modelling and safety-case kickoff.
- 2
Phase 2 — Surveillance & Navaid Design
10–14 weeksRadar, ADS-B/MLAT, navaid siting, voice comms and CWP layout with redundancy plan.
- 3
Phase 3 — Build & Integration
20–30 weeksAntenna, shelter and CWP build with progressive integration to flight-data systems.
- 4
Phase 4 — Operational Trials
6–10 weeksShadow-mode operations, controller training and regulator-witnessed safety case sign-off.
- 5
Phase 5 — In-Service Support
Ongoing24/7 support, calibration flights, software updates and capacity uplift studies.