Renewable Energy

Generation-to-grid integration for utility-scale and DER assets — SCADA, BESS controls and grid forecasting.

Capabilities

  • Solar SCADA
  • BESS controls
  • Smart-grid integration
  • Forecasting & dispatch
  • Carbon analytics
  • Wind turbine SCADA
  • Hybrid plant controllers

Typical use cases

  • Utility-scale PV
  • Microgrids
  • Industrial captive
  • Wind-solar hybrids

Measured outcomes

  • Higher CUF
  • Lower curtailment
  • Verified carbon accounting

Standards & compliance

IEC 61850IEEE 1547Local grid codes
Implementation timeline

Predictable delivery, phase by phase

Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.

  1. 1

    Phase 1 — Resource & Grid Study

    4–6 weeks

    Resource assessment, grid-code compliance and offtake mapping.

  2. 2

    Phase 2 — Plant Controls Design

    8–10 weeks

    SCADA, BESS, plant controller and forecasting architecture under IEC 61850.

  3. 3

    Phase 3 — Build & Commissioning

    16–28 weeks

    Plant install, controller integration and grid-code compliance testing.

  4. 4

    Phase 4 — Grid Energisation

    4–6 weeks

    Grid-code witness tests, dispatch readiness and CUF baselining.

  5. 5

    Phase 5 — Asset Performance Mgmt

    Ongoing

    24/7 NOC, predictive O&M and curtailment minimisation.