OCC build-outs, station ELV, on-train networks and passenger information for metro, light rail and mainline operators.

Capabilities

  • OCC & SCADA
  • Station CCTV & access
  • PA / PIDS
  • Tunnel radio & comms
  • Fare collection integration
  • CBTC interface integration
  • Passenger Wi-Fi

Typical use cases

  • New line commissioning
  • Brownfield modernisation
  • Crowd management
  • Tunnel safety
  • Multi-operator interchange hubs

Measured outcomes

  • Higher on-time performance
  • Reduced incident dwell
  • Lower OPEX per train-km

Standards & compliance

EN 50126/8/9 (RAMS)Local rail authoritiesIEC 62280 (safety comms)
Implementation timeline

Predictable delivery, phase by phase

Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.

  1. 1

    Phase 1 — Operations & Safety Concept

    4–6 weeks

    ConOps with operator, RAMS strategy and inter-system interface mapping.

  2. 2

    Phase 2 — Station & OCC Design

    10–14 weeks

    Station ELV, OCC, tunnel radio and PIDS architecture under EN 50126.

  3. 3

    Phase 3 — Civil-aligned Build

    20–36 weeks

    Cabling, station fit-out and OCC build aligned to civil handover windows.

  4. 4

    Phase 4 — Trial Running

    8–12 weeks

    Trial-running tests, safety case approval and operator handover.

  5. 5

    Phase 5 — Operations Support

    Ongoing

    24/7 OCC support, obsolescence management and capacity-uplift studies.