Metro & Rail
OCC build-outs, station ELV, on-train networks and passenger information for metro, light rail and mainline operators.
Capabilities
- OCC & SCADA
- Station CCTV & access
- PA / PIDS
- Tunnel radio & comms
- Fare collection integration
- CBTC interface integration
- Passenger Wi-Fi
Typical use cases
- New line commissioning
- Brownfield modernisation
- Crowd management
- Tunnel safety
- Multi-operator interchange hubs
Measured outcomes
- Higher on-time performance
- Reduced incident dwell
- Lower OPEX per train-km
Standards & compliance
EN 50126/8/9 (RAMS)Local rail authoritiesIEC 62280 (safety comms)
Implementation timeline
Predictable delivery, phase by phase
Indicative programme tailored to this sector — adapted to scope, scale and regulatory context during discovery.
- 1
Phase 1 — Operations & Safety Concept
4–6 weeksConOps with operator, RAMS strategy and inter-system interface mapping.
- 2
Phase 2 — Station & OCC Design
10–14 weeksStation ELV, OCC, tunnel radio and PIDS architecture under EN 50126.
- 3
Phase 3 — Civil-aligned Build
20–36 weeksCabling, station fit-out and OCC build aligned to civil handover windows.
- 4
Phase 4 — Trial Running
8–12 weeksTrial-running tests, safety case approval and operator handover.
- 5
Phase 5 — Operations Support
Ongoing24/7 OCC support, obsolescence management and capacity-uplift studies.