All case studiesMetro & Rail
Metro Operations & Signalling Refresh
Metro AuthorityEurope2023CBTC · SCADA · PIS
CBTC signalling refresh, station SCADA, PIS and unified operations control centre for a metropolitan metro network.
ROI
+27% frequency
Scale
84 km, 62 stations
Stack
CBTC · SCADA · PIS
Key outcomes
- +27% train frequency at peak
- 99.98% on-time performance
- Single OCC across all lines
Technology stack
CBTCStation SCADAPassenger infoOCC video walls
Programme structure
Phased delivery, single accountability
- 01
Discovery
Weeks 1–4Stakeholder workshops, current-state audit and success metrics.
- 02
Design
Weeks 5–12Reference architecture, LLD, BOQ and integration contracts.
- 03
Build
Months 3–9Hardware installation, software configuration and progressive FAT/SAT.
- 04
Cutover
Final weeksEnd-to-end testing, operator training and hyper-care.
- 05
Operate
Ongoing24/7 NOC/SOC, AMC and continuous improvement.
More case studies
Adjacent references
Start your smart transformation
Talk to our integration architects. Get a tailored roadmap for your enterprise, building, or smart city project — from blueprint to 24/7 operations.