Metro Operations & Signalling Refresh

Metro AuthorityEurope2023CBTC · SCADA · PIS

CBTC signalling refresh, station SCADA, PIS and unified operations control centre for a metropolitan metro network.

ROI
+27% frequency
Scale
84 km, 62 stations
Stack
CBTC · SCADA · PIS

Key outcomes

  • +27% train frequency at peak
  • 99.98% on-time performance
  • Single OCC across all lines

Technology stack

CBTCStation SCADAPassenger infoOCC video walls
Programme structure

Phased delivery, single accountability

  1. 01

    Discovery

    Weeks 1–4

    Stakeholder workshops, current-state audit and success metrics.

  2. 02

    Design

    Weeks 5–12

    Reference architecture, LLD, BOQ and integration contracts.

  3. 03

    Build

    Months 3–9

    Hardware installation, software configuration and progressive FAT/SAT.

  4. 04

    Cutover

    Final weeks

    End-to-end testing, operator training and hyper-care.

  5. 05

    Operate

    Ongoing

    24/7 NOC/SOC, AMC and continuous improvement.