All case studiesSmart Port

Container Terminal Automation Programme

Global Terminal OperatorAPAC2024TOS · OCR · IoT

Automated gate, yard and crane operations integrated with the terminal operating system across an 8-berth deep-water port.

ROI
+34% throughput
Scale
8 berths, 22 cranes
Stack
TOS · OCR · IoT

Key outcomes

  • +34% gross crane throughput
  • OCR-driven gate dwell down 71%
  • Live yard visibility for ops & customs

Technology stack

TOS integrationOCR / ANPRCrane telematicsReefer IoT
Programme structure

Phased delivery, single accountability

  1. 01

    Discovery

    Weeks 1–4

    Stakeholder workshops, current-state audit and success metrics.

  2. 02

    Design

    Weeks 5–12

    Reference architecture, LLD, BOQ and integration contracts.

  3. 03

    Build

    Months 3–9

    Hardware installation, software configuration and progressive FAT/SAT.

  4. 04

    Cutover

    Final weeks

    End-to-end testing, operator training and hyper-care.

  5. 05

    Operate

    Ongoing

    24/7 NOC/SOC, AMC and continuous improvement.